The revlsed draft sOR (a) p.. dlrchart. which is used as a source of drinkin8 water.e wBt€r whlch m.. slnce the SOR5 () for AsP/Modlfled ASP has. GoMP had constituted a Committee to finalize SOR vide no. /13/ reviewthe SOR by Works/W&P Section of all three g of . subject work for KLTPS as per R & B / GWSSB S.O.R. or based on budgetary offer. Number: , Tender Number: KLTPS/, Tender Prod.
Author: | Arashidal Kagajora |
Country: | Montserrat |
Language: | English (Spanish) |
Genre: | Sex |
Published (Last): | 22 June 2009 |
Pages: | 392 |
PDF File Size: | 1.48 Mb |
ePub File Size: | 17.89 Mb |
ISBN: | 290-2-79190-607-8 |
Downloads: | 65817 |
Price: | Free* [*Free Regsitration Required] |
Uploader: | Fekora |
Current status of southwest monsoon and More information. The census population of entire Surat city, for the total area of sq. Fine Screen Chamber 3. This assumption takes into gassb the water being used from private wells, hand pumps and infiltration allowance. The origin of the city can be traced to the old Hindu town of Suryapur, during A.
Key Values
The development plan has been prepared by SMC delineates the land use pattern for various town planning TP schemes and the municipal and the other governing agencies in this area are required to implement the development policies as per the guidelines given in the plan. Gwwsb institute framework is presented as shown below. The characteristic of raw sewage and treated sewage considered for the design is summarized in the Table These projections are based on a more practical approach wherein the 201415 of growth in the adjoining areas of the city are compared with those in the city limit and the areas where heavy migration is expected are identified and factors like existing population density, land use pattern, development plans, industrial growth etc.
Detailed gwszb of all elements of the project activities existing and proposed More information.
SURAT MUNICIPAL CORPORATION
Schemes for the Dindoli Drainage Zones Table However, considering the pumping station and rising main augmentation work going on at present, it is forecasted that more than MLD sewage will reach the STP. As a part of SMC limits, town planning schemes are being prepared and under implementation. Concentration of these activities combined with residential developments has resulted in considerable expansion of the city limits.
The areas like Limbayat, Dindoli, Umarwada, Anjana are considered as developed areas whereas gswsb like Magob, Dumbhal is considered as developing area.
With the walled city at its centre, the city forms an arc of a circle, the bends enclosed by its walls stretching for about a mile and a quarter along the bank. Raw and Treated Sewage Characteristics Sr.
Secondary Settling Tanks Moreover, as discussed in earlier chapter, per capita wastewater flows, for the design of sewerage system are considered to be equivalent to the per capita water supply reaching to the consumer. After the rise of the port at Bombay, Surat faced a severe blow and its ship building industry also declined. VAT registration More information.
SURAT MUNICIPAL CORPORATION – PDF
Project feasibility study II. As the development as well as population in these areas of SMC was limited to certain extent only, in comparison of other part of Surat city. The summers 2014-1 quite hot with temperatures ranging from C to C. Surat was also a flourishing centre for ship building activities. Chapter 5 Web Edition: Since, SMC has an extensive laboratory at the sewage treatment plant itself.
States Fiscal Consolidation States.
Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the. SMC has already appointed the consultant for design and detail engineering; who will also carry out survey and soil investigation. The three anaerobic reactor will be constructed ahead of Aeration Tank. Digested sludge gessb and pump house The other units required are: The average ground level in the area varies from m to 5.
Cost Saving State of the art technology for the treatment will reduce the pollution load in the river, will reduce the water treatment cost. The rates for some of the items specifically mechanical and instrumentation works are based on market rates.
Gujarat Water Supply and Sewerage Board
Parshall flume for flow measurement 5. Only those bidders satisfying the qualifying criteria shall be considered. The ideal technology for LWM in Urban locality would be cost efficient for the long-term, with desired quality of recycled water, 214-15 information. Basic Features More information. High Rise Flats IV: Soil Investigations, as required. Hence, considering future diversion of sewage to another STP, new STP of MLD is proposed with total augmentation up to Sog is considered under this project report Need of the Project The followings are the main reasons for the novation of existing sewage treatment plant at Dindoli.
It will save time.
Hence, the disposal standards shall have to gassb upgraded as per the latest revised manual of CPHEEO on sewage treatment. Aerated lagoons for the treatment of municipal wastewater Aerated lagoons for the treatment of municipal wastewater General Up to now several new methods of wastewater treatment in rural districts have been applied. Life expectancy at birth reflects More information.